Boric acid in added cooling water ensures that nuclear fission is shut down . Cement grouting is most likely unsuitable at this stage because a functional cooling system needs to be maintained for as long as possible. Once short lived isotopes have decayed and heat production diminishes, then other options need to be explored. Partial meltdown may rule out dismantling the core. Japan has a highly developed reprocessing industry. Recycling the fuel elements would be the best long term strategy but entombing the whole lot in concrete would be in the mix of options.
- Forums
- ASX - General
- meltdown in japan
meltdown in japan, page-5
Featured News
Featured News
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online