Good work fishy
AMX - Metwork confirms life of mine recoveries of 84%
Trading Indicator : positive
Posted by Steuart McIntyre on Sunday, January 29 2012, 9:42 PM ET
Ampella Mining Limited (ASX:AMX, A$1.61
Outperform, Speculative Risk; A$3.00 target)
Ampella today released positive results for its metallurgy results at its Konkera gold project in Burkina Faso.
The metallurgy testwork confirmed:
• Overall life of mine recoveries of 84% (RBCe 85% long term)
• Albion Process Could Increase Recoveries to 95%: Preliminary results from a process of sulphide oxidation followed by cyanide leeching known as the Albion process, suggests that sulphide recoveries could potentially be improved to 95%
• A conventional gravity/CIL flow sheet is suitable for treating all oxide and transitional ores as well as the Kouglaga sulphide ore, at modest a grind size of P80 of 106µm, including 30-50% recovery from gravity:
o Oxide Ore: 94-98% recovery
o Transitional Ore: 88-95% recovery
o Kouglaga Sulphide Ore: 98% recovery
• For the sulphide ores at Konkera North and Konkera Main/East, assuming a sulphide float and ultra-fine grinding, the metwork confirmed:
o Konkera North Sulphide Ore: 91% recovery, at grind size of P80 of 10µm
o Konkera Main / East Sulphide Ore: 71% recovery, at grind size of P80 of 8µm
• A breakdown of the component recoveries for the sulphide ores at Konkera North and Konkera Main/East is provided in Exhibit 3 below.
RBC Comment: We regard the confirmation of a life of mine recoveries of 84% at Konkera, as a positive development Ampella. While the ultra-fine grind size of 8-10µm required for the sulphide ores at Konkera North and Konkera Main/East will likely mean higher costs, it is important to note that this ultra-fine grind is only required for the 5-6% of the ore which is floated to a sulphide concentrate – i.e. we expect the overall impact on cash costs will be relatively modest.
In addition, while testing remains at an early stage, the potential to increase recoveries to 95% via the Albion process represents significant potential upside.
Ampella is due to release the results of its PFS at Konkera in the next few months – a key de-risking milestone for the company, in our view. Our key assumptions for Konkera are a US$200m project, producing ~200kozpa at cash costs of ~US$600/oz, over an initial ~10 year life.
- Forums
- ASX - By Stock
- metallurgical testwork results for konkera
AMX
aerometrex limited
Add to My Watchlist
2.33%
!
21.0¢

Good work fishyAMX - Metwork confirms life of mine recoveries of...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
21.0¢ |
Change
-0.005(2.33%) |
Mkt cap ! $19.94M |
Open | High | Low | Value | Volume |
21.5¢ | 21.5¢ | 20.5¢ | $6.127K | 29.40K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 32790 | 21.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
21.5¢ | 21574 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 32790 | 0.210 |
1 | 45757 | 0.205 |
2 | 227485 | 0.200 |
1 | 100000 | 0.190 |
2 | 8333 | 0.180 |
Price($) | Vol. | No. |
---|---|---|
0.215 | 21574 | 2 |
0.220 | 23683 | 1 |
0.230 | 12000 | 1 |
0.240 | 3670 | 1 |
0.250 | 5419 | 2 |
Last trade - 14.21pm 23/06/2025 (20 minute delay) ? |
Featured News
AMX (ASX) Chart |