I would imagine any means of reducing the quantity of product being HCl leached would be welcome. Especially seeing the high leach times required so far.
A process that looks like: Grizzly loader -> Screening -> Milling -> Mag Sep -> Flotation -> Leaching. Higher CAPEX but lower OPEX due to reduced HCl consumption.
I am not 100% sure on reagents used in REE float so unsure of the cost but a study would need to be completed to weigh the flotation cost up against the extra Leach but can't see it being more expensive.
With regards to the mag separation Greenbushes Lithium use them to increase grade prior to flotation as well so proven in a different sector. Expensive gear though.
All in all just the Esperance Clays ticking another box.
- Forums
- ASX - By Stock
- Metallurgy & Beneficiation News
I would imagine any means of reducing the quantity of product...
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MRD (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.785M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $3.086K | 3.086M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 5695000 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 219267703 | 109 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 5695000 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 219267703 | 109 |
0.003 | 99440170 | 33 |
0.004 | 34340677 | 19 |
0.005 | 7747476 | 6 |
0.006 | 5976353 | 8 |
Last trade - 14.37pm 28/06/2024 (20 minute delay) ? |
Featured News
MRD (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online