MEU 2.13% 4.6¢ marmota limited

i think we must not underestimate Iron Ore here:compare it to...

  1. 2,127 Posts.
    lightbulb Created with Sketch. 3
    i think we must not underestimate Iron Ore here:

    compare it to WPG , Pecular Knob = CAPEX 170mln + opex $70 per tonne ; NOTE WPG has excellent grade FE 63% but its ore below surface on avarage 60 or 70 meters >> so some excavation hence opex $70

    Their ore demands $155-160 per tonne

    Now for Marmota

    Grades FE 55% assume we produce 3.5mln tonnes as well
    Price US$115-120


    our OPEX should be lower , we have outcrop of 8-10 km and from it we can get 80-100 mln Tonnes of 55Fe% DSO

    So, if our Opex comes at $50-55 per tonne ( which it logically shoul) and CAPEX 150-170mln over longer mine life over 20 years( with MEU tonnage) we should still be all up cash cost within AUD65-70 per tonne


    I believe very attractive.... well even if margin $30-40 per tonne it is EBIT of approx $100mln


    but we are 8-12 month away from our JORC and official numbers


    looking at 8-10km outcrop it will make big difference to OPEX
 
watchlist Created with Sketch. Add MEU (ASX) to my watchlist
(20min delay)
Last
4.6¢
Change
-0.001(2.13%)
Mkt cap ! $48.70M
Open High Low Value Volume
4.7¢ 4.7¢ 4.5¢ $47K 1.023M

Buyers (Bids)

No. Vol. Price($)
4 225019 4.5¢
 

Sellers (Offers)

Price($) Vol. No.
4.6¢ 211960 3
View Market Depth
Last trade - 10.52am 28/06/2024 (20 minute delay) ?
MEU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.