MGT 11.1% 12.0¢ magnetite mines limited.

MGT Progress and Prospects, page-158

  1. 2,694 Posts.
    lightbulb Created with Sketch. 1756
    Correct me if I'm wrong, but I was under the impression that PFS is already funded as stated in oversubscription announcement at end of CR .... that 20mill referenced is for various stages throughout the project

    *Stage 1: 5 mill for commencement of PFS and NextOre trail, completed without BMD

    *Stage 2: 5 mill for finalisation of PFS, accommodated by recent CR and BMD no longer required

    *Stage 3: 5-10mill for completion of DFS/BFS, N/A at this current time.

    It will be interesting to see if they still want a stake in project upon commencement of stage 3 but IMHO retaining 100% of razorback accommodated by future. CR, (either by insto only or similar CR to recent one) is significantly more profitable to holders then relinquishing half our flagship project.
    https://hotcopper.com.au/data/attachments/2544/2544669-8b6429994b965a42112bc4a44b82a0e3.jpg



    https://hotcopper.com.au/data/attachments/2544/2544672-0d21e0c8b099c0ef320e9acb51b97d3c.jpg
 
watchlist Created with Sketch. Add MGT (ASX) to my watchlist
(20min delay)
Last
12.0¢
Change
-0.015(11.1%)
Mkt cap ! $13.84M
Open High Low Value Volume
13.5¢ 13.5¢ 12.0¢ $37.22K 290.0K

Buyers (Bids)

No. Vol. Price($)
5 87498 12.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.0¢ 4369 2
View Market Depth
Last trade - 16.10pm 12/11/2024 (20 minute delay) ?
MGT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.