MGT 1.39% 35.5¢ magnetite mines limited.

An interconnector has been in the pipelines for a while. As of...

  1. 110 Posts.
    lightbulb Created with Sketch. 26
    An interconnector has been in the pipelines for a while. As of July it was slated by AEMO as a priority and has been granted major project status. The FR article i just read stated the builders are in the finance stage of operation. Since ScoMo just released his new energy led plan I think they might have found some $$ help. Interconnector Due to be completed 2022. Just in time but as stated above might not even need it.. IMO being out this way, water is our more important puzzle to solve and next big hurdle.
 
watchlist Created with Sketch. Add MGT (ASX) to my watchlist
(20min delay)
Last
35.5¢
Change
-0.005(1.39%)
Mkt cap ! $34.94M
Open High Low Value Volume
35.5¢ 36.5¢ 35.5¢ $30.01K 83.35K

Buyers (Bids)

No. Vol. Price($)
2 116066 35.5¢
 

Sellers (Offers)

Price($) Vol. No.
37.0¢ 14870 1
View Market Depth
Last trade - 16.10pm 21/05/2024 (20 minute delay) ?
Last
35.5¢
  Change
-0.005 ( 0.00 %)
Open High Low Volume
36.5¢ 36.5¢ 35.5¢ 22957
Last updated 15.58pm 21/05/2024 ?
MGT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.