Hi Sooly,
Yes it is, however that power bill will comprise of a cheap kw/hr price and network charges, which is not reflected in a straight kw/hr price. Typically (depending on peak demand and a multitude of other network costs) the kw/hr price will form a 1/2 to a 1/3 of total power costs. With that said how good is it that the network is prepared to show confidence that their investment will return $$ from MGT. IMO this is the most efficient way to use renewables in this style of project, it allows for efficient location of solar, wind, battery, hydro to be installed within the network in optimum locations, rather than going it alone at a huge expense. Very practical and indicates a good communication between company and the state government.
Cheers,
GS
- Forums
- ASX - By Stock
- MGT Social Media Posts
Hi Sooly,Yes it is, however that power bill will comprise of a...
- There are more pages in this discussion • 364 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MGT (ASX) to my watchlist
(20min delay)
|
|||||
Last
31.5¢ |
Change
0.045(16.7%) |
Mkt cap ! $31.00M |
Open | High | Low | Value | Volume |
27.5¢ | 31.5¢ | 27.0¢ | $149.6K | 518.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 5000 | 30.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
31.5¢ | 33790 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 5000 | 0.300 |
1 | 9000 | 0.295 |
1 | 2000 | 0.285 |
1 | 45000 | 0.280 |
5 | 30073 | 0.270 |
Price($) | Vol. | No. |
---|---|---|
0.315 | 33333 | 1 |
0.320 | 20000 | 1 |
0.330 | 6000 | 1 |
0.340 | 5309 | 1 |
0.400 | 1600 | 1 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
31.5¢ |
  |
Change
0.045 ( 18.9 %) |
|||
Open | High | Low | Volume | ||
27.5¢ | 31.5¢ | 27.5¢ | 45119 | ||
Last updated 15.56pm 03/05/2024 ? |
Featured News
MGT (ASX) Chart |