Tanenui
It is not very different at all. They are using the same seimens eLNG technology that was used at snovit in Norway. The big difference is that the gas field is largely developed already (huge part of the quoted cost for an lng development) and the plant will plug directly into the grid. They are also leasing tankers.
If the cost of the upstream e&P, and the cost of the generators, and the cost of the platforms etc are normalised for onshore then the cost of EWC solution is not wildly different.
Most LNG plants are built in trains of 0.5m to1m tonnes, so I don't see that much risk there.
- Forums
- ASX - By Stock
- EWC
- michael west at it again...
michael west at it again..., page-19
-
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EWC (ASX) to my watchlist
|
|||||
Last
1.0¢ |
Change
0.001(11.1%) |
Mkt cap ! $30.78M |
Open | High | Low | Value | Volume |
1.0¢ | 1.0¢ | 1.0¢ | $10 | 1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 865241 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 416010 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 665241 | 0.009 |
3 | 255000 | 0.008 |
4 | 1781552 | 0.007 |
2 | 2250000 | 0.006 |
1 | 500000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 416010 | 3 |
0.011 | 259422 | 3 |
0.012 | 271025 | 2 |
0.013 | 14184 | 1 |
0.025 | 10000 | 1 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
EWC (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online