In my mind it is not ridiculous at all. CAN aim to do all their own manufacturing and processing... how would they do that without buying the equipment?
and why are you worried about them pouring concrete? I would have thought that was to be expected on a construction site? If anything it is a huge positive - it means that all the base services have been finished and are now being capped by concrete so that fit out can proceed.
- Forums
- ASX - By Stock
- CAN
- Mildura site is a busy place
Mildura site is a busy place, page-149
-
-
- There are more pages in this discussion • 77 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAN (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.4¢ |
Change
-0.003(6.38%) |
Mkt cap ! $20.62M |
Open | High | Low | Value | Volume |
4.7¢ | 4.7¢ | 4.4¢ | $46.33K | 1.026M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 137681 | 4.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.5¢ | 190828 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 137681 | 0.044 |
4 | 235000 | 0.043 |
1 | 83000 | 0.042 |
7 | 325539 | 0.041 |
14 | 1151101 | 0.040 |
Price($) | Vol. | No. |
---|---|---|
0.045 | 190828 | 2 |
0.047 | 56523 | 1 |
0.048 | 97334 | 2 |
0.049 | 39923 | 1 |
0.050 | 273276 | 7 |
Last trade - 15.44pm 18/10/2024 (20 minute delay) ? |
Featured News
CAN (ASX) Chart |