Scoping Study included a draft proposal for an open pit with process plant (including an initial assessment of metallurgical recoveries for gold) and all supporting infrastructure. This was all based around a 1.2 million ounce resource utilizing a spot gold price of A$2,000 and ASIC of $1,615 to produce an IRR of 28.2%. Current gold price is above A$2,675 so the IRR would be through the roof.
IMHO AUC is drilling out a resource with conceptual potential of 2-3 million ounces within a gold camp that could host a bulk mineable resource exceeding 8 million ounces of gold (see earlier post on tonnage potential guesstimate containing 1.4 billion tonnes, where 250,000 million tonnes hosts +1 gram per tonne gold). I am stunned that investors continue to dump AUC at these levels. I am heavily overweight AUC. Good luck to all longs
- Forums
- ASX - By Stock
- AUC
- Mine Site Design and Planning
Mine Site Design and Planning, page-2
-
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AUC (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.5¢ |
Change
-0.001(2.78%) |
Mkt cap ! $96.67M |
Open | High | Low | Value | Volume |
3.6¢ | 3.6¢ | 3.4¢ | $72.72K | 2.064M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 1124193 | 3.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.5¢ | 917637 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 1124193 | 0.034 |
10 | 1199003 | 0.033 |
11 | 1003162 | 0.032 |
12 | 2663386 | 0.031 |
20 | 2813866 | 0.030 |
Price($) | Vol. | No. |
---|---|---|
0.035 | 917637 | 1 |
0.036 | 2034459 | 6 |
0.037 | 282777 | 4 |
0.038 | 1523769 | 5 |
0.039 | 700000 | 4 |
Last trade - 16.10pm 01/07/2024 (20 minute delay) ? |
Featured News
AUC (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online