AUC 2.78% 3.5¢ ausgold limited

Mine Site Design and Planning, page-2

  1. 4,747 Posts.
    lightbulb Created with Sketch. 1005
    Scoping Study included a draft proposal for an open pit with process plant (including an initial assessment of metallurgical recoveries for gold) and all supporting infrastructure. This was all based around a 1.2 million ounce resource utilizing a spot gold price of A$2,000 and ASIC of $1,615 to produce an IRR of 28.2%. Current gold price is above A$2,675 so the IRR would be through the roof.

    IMHO AUC is drilling out a resource with conceptual potential of 2-3 million ounces within a gold camp that could host a bulk mineable resource exceeding 8 million ounces of gold (see earlier post on tonnage potential guesstimate containing 1.4 billion tonnes, where 250,000 million tonnes hosts +1 gram per tonne gold). I am stunned that investors continue to dump AUC at these levels. I am heavily overweight AUC. Good luck to all longs

 
watchlist Created with Sketch. Add AUC (ASX) to my watchlist
(20min delay)
Last
3.5¢
Change
-0.001(2.78%)
Mkt cap ! $96.67M
Open High Low Value Volume
3.6¢ 3.6¢ 3.4¢ $72.72K 2.064M

Buyers (Bids)

No. Vol. Price($)
6 1124193 3.4¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 917637 1
View Market Depth
Last trade - 16.10pm 01/07/2024 (20 minute delay) ?
AUC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.