This borrowed from Brantleys post on the weekend
The Project can be summarised as follows:
* "An asset base conceptually estimated by Austind to be at least 200 MT of iron ore grading 60%+ Fe, occurring primarily as hematite and magnetite, hosted by banded iron formation (BIF) lithology.
* Tonnage estimates are based on the spatial size of the �Iron Ore Hill� and assumes a conservative depth extension of 100 meters and limited width.
* The Project is contained on 350 acres of land (located at Kakkur Village) where Austind has advanced negotiations to freehold purchase via MOU with the land owners.
* Preliminary investigations by Austind, of limited testing completed by a government department in India, indicates hematite may comprise 93% allowing a conceptual residual Fe grade of approximately 63%.
* Site visit conducted to the Kerala Iron Ore Project has verified iron mineralisation occurring continuously over approximately 8kms of strike.
* Rock chip analysis has returned results from pervasive, large magnetite orebody with Fe grades ranging 43-52%, which compare favourably to global averages for magnetite ores.
* Test work completed by the Indian Government indicates the ores are amenable to beneficiation, and 65%+ concentrates are achievable.
*The deposits are easily accessed by sealed roads and village tracks 17kms
from the main town of Calicut, and are supported by power and infrastructure and port facility."
- Forums
- ASX - By Stock
- ELE
- minimum 60p.c fe and jorc due this month
minimum 60p.c fe and jorc due this month, page-11
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ELE (ASX) to my watchlist
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.27M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ELE (ASX) Chart |
Day chart unavailable