Everything on track, just need to wait for the MLA, it must be coming soon and so will Gekko!
Volume slowly increasing on trades, looking good, should eventually break out nicely on good volume such as that on 9th July.
- Forums
- ASX - By Stock
- Mining lease
Everything on track, just need to wait for the MLA, it must be...
-
- There are more pages in this discussion • 211 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CLZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.439M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $1.101K | 1.100M |
Featured News
CLZ (ASX) Chart |