From their anns...........
Metallurgical testing of Campoona ores will continue throughout the June Quarter culminating in the establishment of scale-up testing to produce up samples of a size needed for potential customers to run diagnostic testing.
Further improvements in recovered grades are likely as various upgrading techniques remain to be tested over the coming months.
Medium and Fine flake recovery studies are still in progress.
Further metallurgical results including the percentages and grades of flake graphite to be released to the market in April 2013..... (this is running late, assume it could be the next announcement and/or news on Robertstown copper-gold target)
From their time line - all planned between now and end of 2013..........
Resource estimation for Campoona Central
Ongoing Community consultation
Bulk sampling
Scale-up testing
Scoping study
Reserve estimation
Feasibility Study
In light of the significant knowledge gained in floating of Campoona samples, the tests for Sugarloaf will be revisited with the expectation of significant improvements in the quality of Sugarloaf graphite concentrates.
and last but not least.....
Exploration drill will be conducted at the Robertstown copper-gold target commencing late April 2013.
- Forums
- ASX - By Stock
- AXE
- mining south australia
mining south australia, page-5
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AXE (ASX) to my watchlist
(20min delay)
|
|||||
Last
23.0¢ |
Change
-0.010(4.17%) |
Mkt cap ! $58.61M |
Open | High | Low | Value | Volume |
24.0¢ | 24.0¢ | 23.0¢ | $43.07K | 185.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 128618 | 23.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
24.0¢ | 146524 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 128618 | 0.230 |
15 | 493142 | 0.225 |
6 | 48202 | 0.220 |
2 | 140000 | 0.215 |
2 | 5500 | 0.210 |
Price($) | Vol. | No. |
---|---|---|
0.240 | 93980 | 3 |
0.245 | 20000 | 1 |
0.250 | 19100 | 3 |
0.255 | 20000 | 1 |
0.260 | 40949 | 3 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
AXE (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online