Latest report possible I think the Quarterly. They say before the end of the first half of the year.
I agree that this seems a little bit optomistic. But who knows. That is what management maintain.
All they need is a rig. If they announced bang bang we have contratced a rig ready to drill in June, then they can get cracking on the Borsano #1 gas target which is probably all they will have money for after Tanzania.
- Forums
- ASX - By Stock
- KEY
- mkt cap 7.5m and 8km from 250mmboes oil
mkt cap 7.5m and 8km from 250mmboes oil, page-5
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
Add KEY (ASX) to my watchlist
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KEY (ASX) Chart |
Day chart unavailable