Interesting hearing from other long term holders. I cant get too excited about the JV at this stage. I agree it sounds promising, but also a long way off - considering the lengthy process to date. LSX are citing drilling results from 1982 in their latest release! They also said drilling is on hold until after the JV is finalised and any additional results (from previous drilling) won't be available until after drilling recommences (after JV).
Then there is development of the JV concept study >drilling > resource estimates > BFS > etc
This extract from the latest release sounds very preliminary:
Pani Besar Internal Concept Study
The Pani Joint Venture is working on an internal concept study focused on how a combined Pani Besar project might look. The purpose of the concept study is to help scope further work, understand key risks requiring further assessment, and to assess for potential fatal flaws. The study is premised on high level assumptions, including that the Pani deposit is one continuous zone of mineralisation across the two tenements.The Internal Concept Study is being undertaken to determine the potential viability of an open pit mine with conventional milling and CIL processing. The study is a preliminary technical and economic study based on low-level technical and economic assessments that are not sufficient to support the estimation of ore reserves. Further evaluation and appropriate studies are required before any ore reserves estimate or any assurance of an economic development of the project.The combination of the Pani IUP and Pani COW unlocks optimal development of the Pani deposit unrestricted by tenement boundaries, including:l Favourable topography and ore geometries: low strip ratio, open pit operation amenable to large scale bulk mining.l Metallurgical work to date suggests high recoveries are achievable, with conventional CIL assumed for the internal concept study.l Low processing costs anticipated, with grid power available.l Subject to appropriate assessment, initial concepts envisage 7.5 Mtpa to 15 Mtpa processing rates.
- Forums
- ASX - By Stock
- Mkt Price to NTA
LSX
lion selection group limited.
Add to My Watchlist
2.15%
!
95.0¢

Interesting hearing from other long term holders. I cant get too...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
95.0¢ |
Change
0.020(2.15%) |
Mkt cap ! $133.3M |
Open | High | Low | Value | Volume |
95.0¢ | 96.5¢ | 93.5¢ | $87.76K | 92.46K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 11115 | 94.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
95.0¢ | 9546 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 12115 | 0.940 |
6 | 27940 | 0.935 |
4 | 15750 | 0.930 |
3 | 9564 | 0.925 |
3 | 17200 | 0.920 |
Price($) | Vol. | No. |
---|---|---|
0.950 | 20811 | 2 |
0.960 | 18860 | 2 |
0.965 | 13206 | 2 |
0.970 | 50000 | 1 |
0.980 | 55284 | 3 |
Last trade - 13.34pm 17/06/2025 (20 minute delay) ? |
Featured News
LSX (ASX) Chart |
The Watchlist
RC1
REDCASTLE RESOURCES LIMITED
Ronald Miller, Non-Executive Director
Ronald Miller
Non-Executive Director
SPONSORED BY The Market Online