I have never said there was anything wrong with the technology, WHEN IT WORKS. You will not know that UCG will work in Kingaroy until they conduct the pilot/trial burn. The pilot burn is not due to begin until Apr/May next year and will then last for a period of time. The last time that Dr Len conducted a trial burn it lasted 3 years. You will then need to build the UCG field, design and construct a power station. That costs money and CXY doesn’t have very much. I would not expect any help from CS Energy, given the history.