    "If the plant design is simple, does that mean the fact that they couldn't choose an contractor that could finish the work on time mean only 1 of those two things: they sucked at managing the plant design and construction, and/or the plant design and constructionn is NOT straightforward/simple as previously thought? Come on, at least one of these two, if not both, must be correct."

    First - The relative simplicity of a fertilizer plant is not my opinion river, it is fact. It does not require new, unique, customised or untested technology. Fertiliser plants around the world have been based on a similar design for decades. But again your making assumptions about why the contract was terminated and have incorrectly provided a one or the other scenario when there are many other reasons we could speculate why the contract was terminated.

    "Second, small cap ex compared to NPV. Sure, then how on earth has finance been such a mess and not been a smooth and clinical finish?"

    Again your connecting dots that dont exist. The fact the project has a small Capex to NPV doesn't change just because the company is doing the best for shareholders by securing non-dilutive funding which is taking longer. They have made it clear this path will delay us 3 months longer than previous financing timelines but is in the best interest to shareholders. You cant call being slightly delayed as such a mess. Its not a mess its just delayed.


 
watchlist Created with Sketch. Add MNB (ASX) to my watchlist
(20min delay)
Last
7.2¢
Change
0.001(1.41%)
Mkt cap ! $63.26M
Open High Low Value Volume
7.1¢ 7.2¢ 6.8¢ $35.24K 505.1K

Buyers (Bids)

No. Vol. Price($)
1 20000 6.9¢
 

Sellers (Offers)

Price($) Vol. No.
7.2¢ 108759 2
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
MNB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.