https://www.linkedin.com/feed/update/urn:li:activity:6544215378351009792
Hopefully this works. Interesting they are exploring ways to improve the strip ratio through change in pit design. I initially thought the feas figures would land somewhere around 3.5:1 but with the change in slope design due to ground/geotechnical issues meant a much wider pit and >5:1 strip.