AIM 5.68% 41.5¢ ai-media technologies limited

monday, page-3

  1. 13,575 Posts.
    lightbulb Created with Sketch. 567
    Visuals on the 1st hole wernt that encouraging Rocket but it seems that 009 might be more encouraging.From what I can gather the mineralisation dips to the west and is better at depth which would be why 009 has better visuals at depth.Hopefully they will give us a diagram if subsequent results give an ore body worth measuring.Should know this after the first few holes with any luck.
    ---------------------------------------------------------
    "S36-007

    Drillhole S36-007 was completed at a final depth of 662 metres, from a target depth of 700 metres. The hole was drilled at an angle of 70 degrees towards the east, and the collar location is situated approximately 400 metres north-northeast from S36-001, which was drilled in 2007 with encouraging results. A total of 259 samples of core were collected, and 161 of these were despatched in April 2008 to the AH Knight laboratory. Additional samples will be despatched in batches containing 100 samples.

    It was reported that the drill hole intersected variably weathered, altered and brecciated quartz porphyry. No visible sulphides were observed, however possible secondary copper mineralisation may be present within hematite rich breccia between 140 metres and 359 metres depth.

    S36-009

    Drillhole S36-009 was completed to a final depth of 791 metres, from a target depth of 700 metres. A decision was made to extend the drill hole beyond the target depth, as geological observations indicated that copper mineralisation was intersected at the bottom of the hole. The hole was drilled at an angle of 70 degrees towards the east, and the collar location is situated approximately 400 metres north-northwest from S36-001.

    The drill hole intersected variably altered quartz porphyry and porphyritic syenite. Some minor malachite, copper sulphide (chalcopyrite and possibly bornite) and some native copper was identified. Sampling of this hole is progressing, and samples are to be despatched upon
    completion.

    ---------------------------------------------------------

    d.
 
watchlist Created with Sketch. Add AIM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.