Thanks for this. I am trying to keep up!
Should I conclude there are or were two facilities proposed in Texas involving Lynas?
Is one a JV with Blue Line and the other a project mainly funded by Pentagon, but which Lynas may have an offtake stream for material notable not needed for Pentagon requirements?
I am not surprised or concerned about KAL perceived delay. The interim supply of LPG in lieu of NG from a pipeline seems a pragmatic move. Not sure where the delay in pipeline occurred but permitting and supply of labour and materials are credible sources of delay.
I've done lots with APA in the past, and generally they are very good to deal with.
If anyone can post links to sources that would be much appreciated.
I think Lynas has had a win with the 6 month extension at LAMP and I'll be very surprised if that is not further extended.
- Forums
- ASX - By Stock
- LYC
- Mongolia to deepen cooperation with US on rare earths, prime minister says
Mongolia to deepen cooperation with US on rare earths, prime minister says, page-20
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.90 |
Change
0.050(0.64%) |
Mkt cap ! $7.384B |
Open | High | Low | Value | Volume |
$7.99 | $7.99 | $7.76 | $28.26M | 3.589M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 14205 | $7.83 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$7.91 | 44842 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 14205 | 7.830 |
1 | 2247 | 7.800 |
1 | 25157 | 7.790 |
1 | 4731 | 7.780 |
1 | 2209 | 7.770 |
Price($) | Vol. | No. |
---|---|---|
7.920 | 2209 | 1 |
7.940 | 15522 | 3 |
7.950 | 3073 | 3 |
7.960 | 10734 | 2 |
7.970 | 7337 | 3 |
Last trade - 16.10pm 06/11/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |