FBR 4.55% 4.6¢ fbr ltd

Monthly Chart

  1. 13,244 Posts.
    lightbulb Created with Sketch. 73
    Haven't been on for a while, I was just reading the next steps from the 7th June 2018 ann. to catch up (was looking for a more recent activities ann)

    Next steps (7th June 2018)
    The Company has now commenced mechanical testing and commissioning of the Hadrian X and is
    working towards testing the DST™ to confirm that it meets the functional and technical requirements.
    As outlined previously, after DST™ testing, the Hadrian X programme will move to the Factory
    Acceptance Testing (‘FAT’ phase, where the Hadrian X will build structures in different configurations
    within a controlled factory environment. This testing process is scheduled to take several months.
    Following FAT, the Hadrian X will then move outdoors for field testing in preparation for its first house
    build, a 3-bedroom, 2-bathroom structure known as Build1. Completion of Build1 is presently
    scheduled for the second half of calendar year 2018.

    Still a few months off it seems with those key milestones in the ann.

    Interesting the monthly chart is under pressure and broken down.

    This is not a down ramp, more of observations into what is happening and looking forward to seeing some DST and FAT results.

 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.