Trying to work out if there are 11 rigs on site why there's only 6 green stars on their plans showing the holes being drilled? They maybe drilling at a lightening speed but the results are slow coming back from the lab. Will they have enough results to announce an upgrade mid Sept? Not looking to down ramp as holding more than my normal limit of shares. Price action so far today is disappointing, wondering who knows more than we do.
- Forums
- ASX - By Stock
- More brilliant results
Trying to work out if there are 11 rigs on site why there's only...
-
-
- There are more pages in this discussion • 41 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CDV (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online