Few things to put into your pipes- dont forget its an open cut, not underground mine. These typically are lower cost, unless overburden is extreme. It does not need a hell of a lot of acid, compared to many. Those estimates of what was it $30m extra or something at 50% incr on assumptions are over the whole ten years total, not per annum.
Some psycho downramper who posts a lot on HC rings them up almost every day. Ive suggested they bill him for time. Or put a blocker on his number/s.
- Forums
- ASX - By Stock
- more buyers than sellers
Few things to put into your pipes- dont forget its an open cut,...
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)