1/4 out:
$A11,561,000 cash at end of 1/4
Results released during the quarter and subsequently from drilling at Current Lake (Figure 3) and Beaver Lake (Figure 4) included the following excellent intersections:
Current Lake:
TBND061: 61.70m @ 5.61g/t Pt+Pd, 0.66% Cu & 0.38% Ni from 29.30m
including: 35.50m @ 8.83g/t Pt+Pd, 1.04% Cu & 0.57% Ni
TBND082: 32.70m @ 5.82g/t Pt+Pd, 0.68% Cu & 0.35% Ni from 17.00m
including: 21.70m @ 7.53g/t Pt+Pd, 0.87% Cu & 0.41% Ni
TBND092: 42.65m @ 6.47g/t Pt+Pd, 0.77% Cu & 0.40% Ni from 21.00m
including: 22.80m @ 7.98g/t Pt+Pd, 0.90% Cu & 0.44% Ni
TBND097: 48.50m @ 6.68g/t Pt+Pd, 0.84% Cu & 0.37% Ni from 43.30m
including: 18.25m @ 8.69g/t Pt+Pd, 1.04% Cu & 0.49% Ni
and: 7.20m @ 14.14g/t Pt+Pd, 1.73% Cu & 0.51% Ni Page | 2
Magma Metals Limited September 2008 Quarterly Report
___________________________________________________________________
Beaver Lake:
BL08-50: 13.85m @ 4.77g/t Pt+Pd, 0.61% Cu & 0.28% Ni from 183.65m
including: 8.35m @ 6.13g/t Pt+Pd, 0.75% Cu & 0.30% Ni
BL08-57: 6.75m @ 6.88g/t Pt+Pd, 0.85% Cu & 0.46% Ni from 313.00m
including: 3.25m @ 10.30g/t Pt+Pd, 1.28% Cu & 0.67% Ni
BL08-61: 28.95m @ 4.29g/t Pt+Pd, 0.60% Cu & 0.38% Ni from 323.00m
including: 8.75m @ 6.98g/t Pt+Pd, 1.00% Cu & 0.62% Ni
The ratio of Pt to Pd in these intersections is approximately 1:1; this is a consistent ratio in all the drilling so far conducted at the project.
- Forums
- ASX - By Stock
- MMB
- more excellent results
more excellent results, page-12
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMB (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham, CEO
James Graham
CEO
Previous Video
Next Video
SPONSORED BY The Market Online