PNM 7.14% 3.0¢ pacific nickel mines limited

more high grade copper at mt lidster

  1. 20,449 Posts.
    lightbulb Created with Sketch. 268
    Malachite Resources NL
    ABN 86 075 613 268
    Suite 1502, Tower B, 799 Pacific Highway, Chatswood NSW 2067
    P O Box 5218, West Chatswood NSW 1515
    Tel. (02) 9411 6033 Fax (02) 9411 6066
    ASX Announcement Code: MAR 30 January 2007
    MORE HIGH GRADE COPPER AT MT LIDSTER
    • Drilling at Mt Lidster in December 2006 has intersected further high grade
    copper mineralisation;
    • Best result was in MLRC09: 18m @ 2.4% Cu, including 2m @ 9.8% Cu.
    • Highest single assay result: 1m @ 15.05% Cu and 1.04g/t Au;
    • True widths of mineralisation up to 12m.
    Malachite Resources NL (ASX: MAR) advises that assay results
    have now been received for samples from December 2006 drilling at
    the Mt Lidster Copper Project, near Mt Isa in northwest Queensland,
    where Malachite has an option to acquire a 100% interest. The best
    intersection in the recent drilling was in hole MLRC09, which cut an
    18m massive sulphide zone from 76m to 94m (11.6m true width),
    with an average grade of 2.4% Cu, including 2m of 9.8% Cu.
    Several holes intersected massive to semi-massive sulphide
    mineralisation, with good copper values, mainly expressed as
    primary chalcopyrite. Other holes intersected the structure where it
    is dominated by quartz rather than sulphide. Copper grades
    correlate well with sulphide content and it is apparent from both
    drilling to date and inspection of the outcrop that mineralisation is
    concentrated into pods or shoots within the Mt Lidster structure, at
    least near surface. Copper mineralisation was also intersected in
    what appear to be parallel or splay structures, some examples of which can be seen at the
    surface. Significant amounts of gold and cobalt are present as accessory metals.
    Twelve shallow, reverse circulation percussion holes were drilled in the latest program, for a
    total of 959m. Drill hole details are set out in Table 1 and assays of the mineralised
    intersections are listed in Table 2. The map below shows the Mt Lidster structure and the
    location of all holes drilled at the project to date.
    Malachite is strongly encouraged by these results, for while the drill sample assays to date are
    mixed, it is clear that this is due to the poddy distribution of mineralisation within the structure.
    Where good mineralisation is intersected the grades can be spectacular – the best single
    assay from the recent program was 1m @ 15.05% Cu and 1.04g/t Au. Much of the structure
    remains to be drill tested and as yet there has been no deep drilling at Mt Lidster at all. It is
    too soon to draw any conclusions about average grades within the Mt Lidster structure overall,
    but it is possible that, in a future mining context, the high grade massive sulphide pods may be
    sufficiently abundant to carry the interspersed lower grade quartz-rich zones. It is also
    possible that the massive sulphide zones will expand or coalesce at depth, where drilling is yet
    to occur.
    Following the current tropical wet season the Company plans to conduct a geophysical
    survey, utilising an electromagnetic (“EM”) technique, at Mt Lidster, with the aim of identifying
    electrical conductors that could represent the best concentrations of massive sulphide
    mineralisation at depth. These will then be targeted by drilling, including diamond drilling if
    warranted, during the 2007 field season.
    Mt Lidster Copper
    Project location map

    Malachite Resources NL – Conrad Drilling Results – January 2007
    Table 1: Drill Hole Details for holes drilled at Mt Lidster in December 2006
    Hole No. Collar Details
    Northing
    GDA94
    Easting
    GDA94
    Magnetic
    Azimuth
    Inclination
    Final Hole
    Depth
    MLRC06 7709959 393653 1360 -530 83m
    MLRC07 7709946 393662 1850 -500 22m
    MLRC08 7709949 393669 960 -500 58m
    MLRC09 7710009 393849 3050 -500 106m
    MLRC10 7710007 393849 2800 -500 136m
    MLRC11 7710010 393851 3460 -500 166m
    MLRC12 7709773 393532 200 -520 76m
    MLRC13 7709775 393527 3150 -650 40m
    MLRC14 7709647 393442 3090 -500 64m
    MLRC15 7709664 393449 3050 -600 58m
    MLRC16 7709658 393462 3050 -600 82m
    MLRC17 7709951 393662 950 -610 68m
    Table 2: Assay Results for holes drilled at Mt Lidster in December 2006
    HOLE NO. FROM
    (m)
    TO
    (m)
    APPROX
    TRUE WIDTH
    (m)
    COPPER
    % Cu
    Au
    g/t
    Co
    %
    COMMENTS
    MLRC06 61 62 0.6 0.25 <0.1 0.04 6m @ 4.2% Cu intersected vertically above
    in MLRC02
    MLRC07 No significant assays. Hole abandoned due to caving ground before reaching target depth.
    MLRC08 24 29 3 0.21 <0.1 0.02 Oblique intersection in oxide zone only
    MLRC09
    Including
    Including
    Also
    76
    76
    76
    89
    94
    78
    77
    94
    11.6
    1.3
    0.6
    3.2
    2.4
    9.81
    15.05
    3.81
    0.21
    0.75
    1.04
    0.37
    0.02
    0.06
    0.02
    0.03
    Massive sulphide intersection
    MLRC10
    And
    122
    54
    123
    63
    0.5
    5
    1.14
    0.02
    0.17
    0.34
    0.03
    <0.01
    Oblique intersection south of MLRC09
    MLRC11 129 137 4.5 0.25 <0.1 0.01 Oblique intersection to north of MLRC09
    MLRC12 43 48 ? 0.45 <0.1 0.09 Very oblique intersection
    MLRC13 18 21 1.3 0.29 <0.1 <0.01 Intersection in oxide zone only
    MLRC14
    Including
    And
    Also
    18
    18
    18
    55
    42
    28
    21
    56
    15.4
    6.4
    1.9
    0.6
    0.28
    0.43
    0.86
    5.96
    <0.1
    <0.1
    <0.1
    0.64
    <0.01
    <0.01
    <0.01
    0.01
    This intersection is NW of main structure
    MLRC15
    Including
    Including
    30
    34
    34
    43
    41
    37
    6.5
    3.5
    1.5
    2.13
    3.73
    6.12
    0.12
    0.17
    0.22
    0.03
    0.05
    0.06
    Includes 1m @ 0.12% Co (36-37m)
    MLRC16 67 71 2 0.47 <0.1 0.05 Deeper cut to MLRC15
    MLRC17 51 54 1.5 0.22 <0.1 <0.01 Deeper cut to MLRC08



 
watchlist Created with Sketch. Add PNM (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
0.002(7.14%)
Mkt cap ! $12.54M
Open High Low Value Volume
3.0¢ 3.0¢ 3.0¢ $540 18K

Buyers (Bids)

No. Vol. Price($)
3 131269 3.0¢
 

Sellers (Offers)

Price($) Vol. No.
3.2¢ 30000 1
View Market Depth
Last trade - 15.16pm 20/06/2024 (20 minute delay) ?
PNM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.