A bit off the recent topic, but the following link is from the company (Kaishan Group, china) that did the ORC project at Sinopec Hainan branch/island in 2014 as an alternative solution due to the delay of Kalina project by then Wasabi & SSNE (as mentioned in the quoted post).
The link below shows some features of this ORC project and a photo of this plant ( screenshot from their case study brochure in chinese)
Sinopec Hainan Oil Refining and Chemical Hot Water Application
Sinopec Hainan Oil Refining and Chemical is the first application in the world – two ORC plant working in series with the hot water as the heat source. They supply of hot water flow rate is 200 t/h with 118℃ temperature. The installation output of first part is 1,300 kW. It can generate 4.63 kWh per ton water under ambient temperature 24.9℃, and the net power generation is up to 70%.
Kerry® ORC screw expander power plant:
Working in series 1 High temperature Low temperature Total Benefits 2 Evaporating temperature 3 101℃ 81℃ 4 Installed power 5 710 kW 630 kW 6 Voltage Sepc 7 6,300 V 6,300 V 8 Net Output ambient temp 34℃ 438 kW 351 kW 789 kW 9 ambient temp 24.9℃ 503 kW 424 kW 927 kW 10 ambient temp 15.5℃ 544 kW 478 kW 1044 kW 11 Annual Output ambient temp 34℃ 3,504,000 kW 2,808,000 kW 6,312,000 kW 12 ambient temp 24.9℃ 4,024,000 kW 3,392,000 kW 7,416,000 kW 13 ambient temp 15.5℃ 4,352,000 kW 3,824,000 kW 8,176,000 kW 14 Annual Production ambient temp 34℃ 420.48 K 336.96 K 757.44 K 15 ambient temp 24.9℃ 482.88 K 407.04 K 889.92 K 16 ambient temp 15.5℃ 522.24 K 458.88 K 981.12 K 17 Annual CO2 discharge reduction ambient temp 34℃ 1,829 Ton 1,466 Ton 3,295 Ton 18 ambient temp 24.9℃ 2,100 Ton 1,770 Ton 3,870 Ton 19 ambient temp 15.5℃ 2,272 Ton 1,996 Ton 4,268 Ton 20 Net Generation Per ton Water ambient temp 34℃ 3.95 kWh 21 ambient temp 24.9℃ 4.63 kWh 22 ambient temp 15.5℃ 5.10 kWh [/IMG]
- 34℃ is the hottest month average temperature, 24.9℃ is the annual average temperature, 15.5℃ is the coolest month average temperature.
- Average working hour is 8,000 hours.
- The electricity price is US$0.12/KWh.
- To generate 1 KWh power discharge 0.522 kg CO2 (The Bureau of Energy of Taiwan, 2012)
http://i68.tinypic.com/2lsb8th.jpg
Some serious competitors out there, hurry up Kalina!
DYOR.
- Forums
- ASX - By Stock
- More Info from KPO
A bit off the recent topic, but the following link is from the...
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KPO (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
-0.001(8.33%) |
Mkt cap ! $29.00M |
Open | High | Low | Value | Volume |
1.2¢ | 1.3¢ | 1.1¢ | $44.81K | 3.779M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 3403081 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.5¢ | 1623771 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 2907966 | 0.011 |
3 | 2500000 | 0.010 |
1 | 35000 | 0.007 |
3 | 486000 | 0.005 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.015 | 1623771 | 3 |
0.016 | 3712267 | 5 |
0.017 | 678791 | 2 |
0.022 | 12000 | 1 |
0.024 | 11000 | 1 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
KPO (ASX) Chart |