Santos has terminated drill rig contract in Cooper because of concerns re safety petormance of the contractor. I guess that means No to Charos 4,5,6, until December quarter. Info in Santos asx quarter release.
Chokes: Vpe had a 32/64 in Mirage and Ventura fields.
Maybe they are scared of any repeat . Chokes are eithier at the top or bottom of well, variable or fixed. Primary to control flow and restrict water ingress. Squidgy may come back with more Tech info. The down hole pressure and porosity and permeabilty of reservoir will all contribute to expectations of sustainable flow. Also in extended production test operator has to advise of evaluation of enhanced recovery processes for better recovery to the powers that be. That includes a larger choke.??
So no secret Mens business allowable but conservation practices are Ok.
That water cut is the thing in producing oil.
247
- Forums
- ASX - By Stock
- ITC
- more info to impress
more info to impress
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)