OK scyther1 Did that and spoke to Hector at COE since they are operators, but he suggested I speak with JKA.
But still was able to get some comment on released info that was not considered SENSITIVE.
ACID stimulation is necessary since the last area of the hole apparently is still clogged with muck/mud/??? but appears not serious. Still necessary to achieve the best results. This may take only a few days (1-2) but they are doing it VERY slowly to avoid problems. So looking forward to about Wednesday for probably production flow testing?
He also was very happy with what could be said up to now.
As to previous flow numbers (up to 1700 barrels per day) were achieved but he considered they would be improved? Anyway very positive conversation without any insider info given me thinks.
JKA Price at posting:
10.7¢ Sentiment: Buy Disclosure: Held