I wouldn't get too itchy...maybe they will need to re-drill some holes, given the iron ore is at depth...
so far, UI 199 - 40metres, Hole UI 201 30 metres of significant visual Marra Mamba iron ore mineralisation between 38 and 68 metres, hole UI 202 has also intersected visual Marra Mamba iron ore mineralisation starting at 48.1m.....
THEREFORE, SO FAR FROM THE 034 TO 036 LINE ACROSS TO 0202, WE MUST HAVE 800M X 400M X at least 60 to 70 METRES THICK AVERAGE = 58M to 70M TONNES
- Forums
- ASX - By Stock
- UMC
- more news
more news, page-44
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)