26 April 2005
Australian Stock Exchange Limited
Companies Announcement Office
Electronic Lodgement System
Dear Sir,
ANNOUNCEMENT TO ASX
DRILLING REPORT: BAYSTONE # 1
PEL 90, COOPER / EROMANGA BASIN, SA
Stuart Petroleum Limited advises that at 0600 hours the Baystone #1 exploration
well was at 2045m and undertaking rig repairs. Following good oil shows in the
basal Birkhead / Hutton DST #1 was run over the interval 1936-1945m. The test
recovered 40bbls of formation water in the drill string. This outcome was similar to
the results at Reg Sprigg West #1.
The next primary oil / gas target, the Tinchoo Formation is prognosed at 2239m.
At Reg Sprigg West #1 the Tinchoo Formation is a productive oil and gas reservoir.
The status of Baystone # 1 at 0600 hours (CST) on 26 April 2005 was:
Location: PEL 90, 90km north of Innamincka
Planned Total Depth: 2500 metres
Current depth: 2045 metres
Operations: Repairing rig
Spud: 2100hrs, 11 April 2005
Participants in the Baystone #1 well are:
Stuart Petroleum Limited (Operator) 75% (STU)
Beach Petroleum Limited 25% (BPT)
Yours faithfully,
Tino Guglielmo
Managing Director
Level 7, 22 King William Street, Adelaide, South Australia 5000 Telephone: (08) 8410 0611
PO Box 8148, Station Arcade, Adelaide, South Australia 5000 Facsimile: (08) 8410 0250
S:\Company Secretary\ASX Announcements\Baystone #1\05-04-26 ASX Drilling Advice Baystone #1.doc
- Forums
- ASX - By Stock
- STU
- more oil for stu
more oil for stu
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STU (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online