VYS 3.13% 33.0¢ vysarn limited

more ponds

  1. 14,002 Posts.
    lightbulb Created with Sketch. 7380
    Have just spent 15 minutes onsite with some very obliging chaps who filled me in with the ponds progress.
    As you can see, a third pond is well advanced and a small overflow pond is to be started shortly.
    The first lined pond IS ready to go with only the pipe to be connected which can be done any time.
    The contractors have had difficulty with the soil/clay being so wet, which has severly delayed work being able to be finished.
    It is very claggy, I walked on-site 5"9 and walked out 6"2.
    With a bit of luck with the weather, the entire site could be completed this month, however, this doesn't affect plant operation as it could commence using pond 1 anytime.

    Cheers.


 
watchlist Created with Sketch. Add VYS (ASX) to my watchlist
(20min delay)
Last
33.0¢
Change
0.010(3.13%)
Mkt cap ! $138.1M
Open High Low Value Volume
32.0¢ 33.0¢ 32.0¢ $1.258M 3.873M

Buyers (Bids)

No. Vol. Price($)
1 29554 33.0¢
 

Sellers (Offers)

Price($) Vol. No.
33.5¢ 13548 1
View Market Depth
Last trade - 16.10pm 17/07/2024 (20 minute delay) ?
VYS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.