? A total of 103 metres of copper mineralisation intersected in BF10RC02
? 27m @ 0.51% Cu and 505ppm Co from 128m, including
7m @ 1.14% Cu and 967ppm Co from 136m, and
57m @ 0.69% Cu, 288ppm Co and 4.26g/t Ag from 163m, including
12m @ 2.48% Cu and 703ppm Co from 207m inBF10RC02
? 17m @ 1.08% Cu, 693ppm Co and 1.82g/t Ag from near surface, and
17m @ 1.51% Cu, 474ppm Co and 7.22g/t Ag from 78m inBF10RC01
? 18m @ 0.38% Cu, 1034ppm Co and 1.75g/t Ag from 180m, and
7m @ 1.18% Cu, 459ppm Co and 1.22g/t Ag from 204m inBF10RC04
? 4 out of 5 holes returned ore-grade intervals, representing an exploration
success of 80%
? Drilling has confirmed the presence of IOCG (Iron Oxide Copper-Gold)
style of mineralisation in Black Fort prospect and Intersected
mineralised zones are open along strike and at depth
? Geological interpretation is underway and follow-up diamond and RC
drilling program up to 5,000m planed for commencement in Q1 2011
? A total of 103 metres of copper mineralisation intersected in...
Add to My Watchlist
What is My Watchlist?