: RE: RE: UPDATE--SHABEEL--1
otters replied 1 day, 16 hours ago
Wildcat well. Formations difficult to predict in advance. Bit selection difficult, probably using insert rock bits rather than PDC which will mean slower drilling. Also possible issues with keeping the hole straight = slower ROP. If there is any significant pore pressure will need higher mud weight = slower ROP. Formations at this depth are likely to be fairly hard and difficult to drill.
- Forums
- ASX - By Stock
- more shabeel coverage
: RE: RE: UPDATE--SHABEEL--1 otters replied 1 day, 16 hours ago...
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RRS (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online