hws, I would like to know what systems have been capacity and end-to-end tested and which haven't, what the risks are with untested systems uncovering design issues and what KML is doing to mitigate these risks and when.
We shouldn't be getting ambiguous statements like "While individual areas of the Concentrator have successfully operated at their design rate" at this late stage of development. They should be telling us precisely what areas are and aren't tested with a risk assessment. The final polishing circuit has not been tested at its design rate I don't believe - what are the risks!! sdo
GBG Price at posting:
14.0¢ Sentiment: ST Sell Disclosure: Held