BML 3.78% 9.6¢ boab metals limited

More than 10X (TEN Times) Current Share Price, page-12

  1. 94 Posts.
    lightbulb Created with Sketch. 22
    An OPF ( ore processing facility ) will need to be established, primary crushers, screens, fines crushing and flotation building with a stacker for stockpiling, the time frame on constructing a small to medium size plant generally takes between 12-18 months... given the current global manufacturing industry state during the Coronavirus that could impact the time frame with which materials are received.....

    I’ve been a holder of Pmy since 2016 and if the day comes that we are commissioning a plant ready for production... well I think we’ll all be retiring
    DYOR
 
watchlist Created with Sketch. Add BML (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.