FAR 1.01% 50.0¢ far limited

Low relief means that the vertical height of the structure is...

  1. 17 Posts.
    Low relief means that the vertical height of the structure is low relative to the lateral extent i.e. The structure has a flat profile in x-sectional view. This is why the fact that SNE-3 came in 11 m high(CNE presentation) to prognosis is so important. The seismic time to depth conversion is then adjusted for the new top reservoir depth in the seismic interpretation and it pulls up the top structure surface to the south, east and west whilst the oil down to true vertical depth remains the same. Hence the reservoir extent is extended areally with a corresponding increase in oil initially in place volumes.
 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
(20min delay)
Last
50.0¢
Change
0.005(1.01%)
Mkt cap ! $46.20M
Open High Low Value Volume
50.0¢ 50.5¢ 49.5¢ $12.74K 25.29K

Buyers (Bids)

No. Vol. Price($)
1 89162 49.5¢
 

Sellers (Offers)

Price($) Vol. No.
50.0¢ 2297 1
View Market Depth
Last trade - 16.10pm 15/08/2024 (20 minute delay) ?
FAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.