From Uraniumbull
---------------------------------------------
Dear Nervous Shareholders,
I would like to reinforce that the JORC will only cover about 370,000 square metres.
It will contain approximately 20,000t of uranium.
Heathgate have identified 10,000,000 square metres of mineralisation.
Additionally they are drilling right now and will add to that area significantly throughout the year.
9,630,000 square metres out of 10,000,000 has not been drilled to JORC Standard.
Heathgate have a massive drill program planned for B4M.
Heathgate have only scratched the surface of this whole area.
I can't stress enough the upside potential of this deposit.
The deposit will grow significantly this year.
Regards Uraniumbull
--------------------------------------------
For every Macrae there is a uraniumbull
- Forums
- ASX - By Stock
- more words of wisdom from uraniumbull
From...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)