SFG 50.0% 0.3¢ seafarms group limited

More Works packages being advertised

  1. 545 Posts.
    lightbulb Created with Sketch. 223
    I know we have been down this path before but it is encouraging that as of this week the company has issued EOIs for significant works packages with a view to going to tender in Feb and commencing work this dry season.
    They must be very confident of locking in the finance to be issuing these packages with such short lead times...

    Some of these docs make interesting reading - the seawater intake is designed to pump 900 megalitres of water PER DAY (900,000 cubic metres!!)

    https://hotcopper.com.au/data/attachments/2842/2842251-f3350a5777362edee91e82d4384ac469.jpg

    https://hotcopper.com.au/data/attachments/2842/2842269-0c1bffc5cfaf2ce08dd7e36e5bec480f.jpg
    https://hotcopper.com.au/data/attachments/2842/2842275-c035803626f8e8b578375c9e337d5903.jpg
 
watchlist Created with Sketch. Add SFG (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.001(50.0%)
Mkt cap ! $14.51M
Open High Low Value Volume
0.2¢ 0.3¢ 0.2¢ $8.478K 3.120M

Buyers (Bids)

No. Vol. Price($)
31 27411056 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 1186210 8
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
SFG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.