Yep, gives confidence that Firefinch are really doing their homework with drilling tests. It will be a shame if the biggest headache for them ends up being having to choose which area of the site will produce the best mining results in relation to their plan.![]()
![]()
I wonder how the dewatering of Morilla will go during the June to October wet? Does Firefinch just keep on pumping albeit knowing more water will come in but take the 2 steps forward 1 step back approach? Have to assume so but gee, it does look like a lot of water that has to go somewhere.