A few have suggested that Morilla might not be viable, I'll simply point them to the following Ann from a while back, just look at the number of consultants involved, I highly doubt it is not viable, simply the aggressive targets for ramp up have been missed - if that is even what has happened.
https://www.investi.com.au/api/announcements/ffx/d2ed40bd-aa1.pdf
The LOMP has been prepared by Firefinch with contributions from the following industry consultants:
Orelogy Pit optimisation, pit design, mining Schedule and Ore Reserves for all
deposits.
Optiro Mineral Resource Estimate for the Morila Deposit.
PCF Capital Financial modelling.
Majesso Mining Tender management and evaluation.
L&MGSPL Tailings storage facility design review.
Sandvik Inspection of crushers – primary, secondary, tertiary and pebble.
Thyssen Krupp Inspection of mills – ball mill and SAG mill.
USP&E Assessment of Power Station and long-term power provision options.
JT Metallurgical Services Metallurgical review and plant capacity improvement.
Orway Plant capacity modelling.
ATC Mali Mill structure refurbishment.
- Forums
- ASX - By Stock
- FFX
- Morilla viablity
Morilla viablity
- There are more pages in this discussion • 179 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FFX (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $236.5M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
FFX (ASX) Chart |
Day chart unavailable