morning traders 11 / 10, page-2

  1. 10,622 Posts.
    lightbulb Created with Sketch. 834
    FPL - Target depth now expected to be reached within 24 Hours
    Upon reaching target depth, a slotted-liner will be run into the well bore in preparation for flow testing and production.

    https://youtu.be/n1jOWZSv-a8
    Last edited by Key Sole: 11/10/17
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.