COB Thackaringa project enters new phase – RC drilling commences...

  1. 440 Posts.
    lightbulb Created with Sketch. 1
    COB
    Thackaringa project enters new phase – RC drilling commences

    To date, the diamond drilling program is progressing strongly and has achieved 2,200m with a campaign target of 3,000m expected to be completed by end March.

    Shareholders are aware that Thackaringa represents the only non-polymetallic (“pure play”) cobalt deposit listed on the ASX, indeed one of very few globally, as 98% of cobalt is produced as a byproduct of either copper or nickel.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.