RXL Youanmi Drilling Update High Grade Intercepts at Junction...

  1. 11,900 Posts.
    lightbulb Created with Sketch. 1297
    RXL





    Youanmi Drilling Update High Grade Intercepts at Junction Prospect



    •Assays received for a further 6 holes from the ongoing drilling program at Youanmi Gold Project.


    •All holes intersected gold mineralisation.


    •High-grade mineralisation intersected at Junction:

    RXRC380: 4m @ 17.5g/t Au from 259m

    RXRC376: 4m @ 6.1g/t Au from 170m

    RXRC378: 3m @ 8g/t Au from 194m

    RXRC379: 3m @ 7.1g/t Au from 243mat end of hole



    •RC drilling continues at Junction in addition to Grace South and Link.


    •Results pending for 9 holes with drilling ongoing.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.