RXL
Youanmi Drilling Update High Grade Intercepts at Junction Prospect
•Assays received for a further 6 holes from the ongoing drilling program at Youanmi Gold Project.
•All holes intersected gold mineralisation.
•High-grade mineralisation intersected at Junction:
RXRC380: 4m @ 17.5g/t Au from 259m
RXRC376: 4m @ 6.1g/t Au from 170m
RXRC378: 3m @ 8g/t Au from 194m
RXRC379: 3m @ 7.1g/t Au from 243mat end of hole
•RC drilling continues at Junction in addition to Grace South and Link.
•Results pending for 9 holes with drilling ongoing.
- Forums
- ASX - Day Trading
- Morning trading April 23
RXL Youanmi Drilling Update High Grade Intercepts at Junction...
- There are more pages in this discussion • 388 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online