RTR out of their TH
Visual mineralisation of Zinc-Pb in every hole, drilling upgraded from 2,500m to 4,000m, diamond drill rig being sent to site, assays fast tracked to be announced next week to give indication of grades with over 40km of strike
- Forums
- ASX - Day Trading
- Morning trading April 8
RTR out of their THVisual mineralisation of Zinc-Pb in every...
- There are more pages in this discussion • 281 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)