- 26 rock chip samples from a 400m by 500m area return results up to 8.6 g/t Ag, 33.1 g/t In, 0.61% Pb and 0.22% Zn.
- Drilling continues to grow the Central Shoot at Limon with strong results including:
- High-grade zones include 4.6g/t gold and 800g/t silver over 0.8m from 27m in LMDD047
- Geophysics and drilling discovers new mineralised structure west of Horden Lake, further potential along strike.
- 2.2m @ 0.77% CuEq from 10.6m - 1.1m @ 0.4% CuEq from 45m - 1.5m @ 0.84% CuEq from 241m
PNN - Power completes acquisition of Lĺtio Niobium Project, Brazil
- 63% Nb2O5 and 9.5% Ta2O5 with 2354ppm partial REO
- 43.5% Ta2O5 and 17.5% Nb2O5 with 1062ppm partial REO
- 41.3% Nb2O5 and 11.99 % Ta2O5 with 1793 ppm partial REO
- 48.4% Nb2O5 and 6.3% Ta2O5 with 4975ppm partial REO
BRK - Gapstow Full Field Development, Final Well Being Drilled
- Tank Battery Construction & Completion Operations Commenced
- Production from the Gapstow FFD is expected to commence in early Q4 2024 and is expected to contribute ~150BOEPD (70% liquids) net to Brookside over an initial 2 years
BCN - MT DIMER MAIDEN ORE RESERVE DEFINED BY PRE-FEASIBILITY STUDY
- Reserve of 21,000 recoverable ounces has been calculated for Lightning and Golden Slipper using a gold price of $AU 3,400
- Total of 147kT @ 4.48 g/t Au could be mined from the Lightning and Golden Slipper pits
PMT - Significant Mineral Resource Upgrade at Shaakichiuwaanaan Lithium Project to Underpin Impending PEA
- 80.1 Mt at 1.44% Li2O and 163 ppm Ta2O5 Indicated, and
- 62.5 Mt at 1.31% Li2O and 147 ppm Ta2O5, Inferred.
PMT - Exploration Target for the Shaakichiuwaanaan Lithium Project Outlines District Scale Opportunity, Quebec, Canada
- Approximately 146 to 231 Mt at 1.0 to 1.5% Li2O.
BCM - EXCELLENT COLUMN LEACH RESULTS - POTENTIAL FOR LOWER COST MINERAL PROCESSING OPTIONS AND SCALABILITY AT EMA PROJECT
BRU - Letter of Intent for drilling rig executed for Canning Basin 2024 drilling campaign
RRR - Multiple Mt Isa style Copper Targets Emerging at Osprey
AMD - Exploration Target for Hematite Fines Project
AZ9 - Regional Exploration Identifies New Copper and Nickel Targets
LTR - Kathleen Valley production milestones continue
TGN - TGN to acquire remaining 80% interest in the Hatches Creek Tungsten Project
GGE - Red Helium Project Drill Permit Secured
AUG - Airborne VTEM commences at Ti-Tree Project
SUM - trading halt is requested pending an announcement in relation to an expansion of the Equador Project in Brazil.
AD8 - Audinate FY24 preliminary unaudited results and FY25 outlook
- Unaudited revenue of approximately US$60.0 million (A$91.5million), up 28.4% in US$
- Unaudited gross profit (GP) of approximately US$44.5 million, up 33.2%
HCL - HighCom Limited Receives New A$2.5m Ballistic Product Order
ATX - ONE MORE PATIENT SHOWS SUSTAINED REDUCTION IN TUMOUR SIZE IN PANCREATIC CANCER TRIAL