TG6 - High Grade Lithium at Jaegermeister
- 10.0m @ 1.19% Li2O from 73.0m - including 2.0m @ 2.07% Li2O from 77.0m
- 6.0m @ 1.38% Li2O from 76.0m - including 2.0m @ 2.00% Li2O from 76m
- 3.0m @ 1.22% Li2O from 49.0m and 3.0m @ 1.24% Li2O from 63.0m (same hole) - including 1.0m @ 2.68% Li2O from 50m
EQN - Further High Grade Results & Drilling Commenced at Mata da Corda
- 5,879 ppm TREO (sample EQ-MC-866) - 5,212 ppm TREO (sample EQ-MC-867)
- 4,733 ppm TREO (sample EQ-MC-592) - 4,067 ppm TREO (sample EQ-MC-699)
- 3,928 ppm TREO (sample EQ-MC-868) - 3,690 ppm TREO (sample EQ-MC-856)
- 20% TiO2 (sample EQ-MC-592) - 19% TiO2 (sample EQ-MC-699)
GMN - Solonópole results find Very Highly Anomalous Lithium
- Assays received from regional stream sediment sampling with peak values of 173 ppm lithium.
TKM - Major Drill Program Commences at Christmas Creek
- High-impact 8,000m RC drill program targeting gold and rare earths in the Kimberley
- Previous intersections at Martin include 7m @ 4.90g/t Au and 2m @ 9.65g/t Au.
IMA - ATLAS PROJECT CONSTRUCTION SET TO COMMENCE
PLL - PIEDMONT LITHIUM REPORTS Q2 2024 RESULTS
- NAL Achieves Steady-State Production; Shipments Shift to Contract Customers
TNC - True North Copper Updates Vero Copper-Silver Resource
- 15.03Mt at 1.46% Cu & 10.59g/t Ag for a contained 220kt Cu & 5.13Moz Ag (Indicated and Inferred)
HZR - 240 HOURS OF CONTINUOUS OPERATION ACHIEVED AT COMMERCIAL DEMONSTRATION PLANT
- Stable plant production of hydrogen and graphite with 97.5% plant uptime
RLT - LIQUID HELIUM PRODUCTION ONLINE
- production train is now fully operational and accumulating liquid helium (LHe) inventory for sale to our customers
PRN - Barminco secures underground contract extension with Barrick at Hemlo, Canada
WCN - Trading Halt - announcement by the Company relating to material assay results for the Great Bear IOCG-U Project
CKA - Trading Halt - to provide information in relation to a new underground mining agreement at BBM.
IDT - IDT Secures New Contract with Sanofi Australia
- worth between $2.5 million and $4 million for the preclinical formulation, development and manufacture of Sanofi’s messenger RNA
GNP - Genus-PFA Wins Multiple Asset-Upgrade, Network Maintenance & Pole Reinforcement Contracts
3DP - Pointerra awarded new contracts by US energy utility customer
- US energy utility customer awards Pointerra US$0.80 million (A$1.23 million) in new contracts
EVZ - NEW CONTRACT WIN
- The total value of this contract is circa $23M - bulk process water tanks package by Rio Tinto
QBE - 2024 Half year result - 1H24 NPAT US$802m vs 1H23 $400m
REA - REA Group delivers an exceptional FY24 result- Revenue of $1,453m, up 23%
- Net profit of $461m, up 24%
360 - Life360 Reports Record Q2 2024 Results - Total Revenue Grew 20% Year-Over-Year to $84.9 million
- Forums
- ASX - Day Trading
- Morning Trading August 9
TG6 - High Grade Lithium at Jaegermeister - 10.0m @ 1.19% Li2O...
-
- There are more pages in this discussion • 141 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online