GGE great ann -- Jesse-1A unexpectedly flows significant helium...

  1. 2,769 Posts.
    GGE great ann -- Jesse-1A unexpectedly flows significant helium to surface during initial re-entry operations. “The Company is thrilled to encounter gas flowing free to the surface with high helium
    concentrations from preliminary swabbing at Jesse-1A. This is highly encouraging and a massive
    step forward in the Jesse appraisal and development programme

    MEK watching, results should be soon imo.
    Assays for 17 shallow infill drill holes from St Anne’s are expected in December
    2023.
     Assays for the final 3 holes from Turnberry are expected in January 2024
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.