GGE -- waiting results -- Jesse-1A – Next Steps
With preliminary swabbing complete, the Company will now isolate the lower, potentially water-wet
Leadville zone with a cement and packer system, to facilitate a comprehensive helium gas flow
test of the upper Leadville helium reservoir target with results expected prior to year end.
RR1 waiting results - A total of 57 holes for 5,282m of RC drilling has been completed to date during Phase 2 drilling.
● The majority of all holes drilled across Phase 2, have reported multiple thick, stacked
pegmatites1 within favourable metasedimentary and lesser mafic volcanic rock type
Results from this part of the Phase 2 Drilling campaign are expected to be received in early
2024, with all samples already sent to the laboratory for analysis
- Forums
- ASX - Day Trading
- Morning Trading December 18
GGE -- waiting results -- Jesse-1A – Next StepsWith preliminary...
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online