MEK -- 18 December 2023 Shallow Oxide Gold at St Anne’s High grade assay results have been returned from the first 10 infill drill holes at St Anne’s (25,000oz @ 2.8g/t Au), part of the Murchison Gold Project. Assays for a further 7 holes are expected in January 2024. New high-grade gold intersections include: o 6m @ 3.71g/t Au from 53m including 2m @ 9.09g/t Au (23SAAC002) o 7m @ 3.51g/t Au from 26m including 2m @ 9.84g/t Au (23SAAC004) o 15m @ 1.47g/t Au from 34m (23SAAC005) o 5m @ 2.15g/t Au from 68m including 2m @ 4.95g/t Au (23SAAC008) o 14m @ 2.28g/t Au from 53m incl. 2m @ 4.57g/t Au and 1m @ 13.45g/t Au (23SAAC010) Results will support a grade control model for the St Anne’s open pits in the March 2024 quarter. Assays for the final 3 holes from Turnberry are expected in January 2024 and work has now commenced on the Turnberry grade control model for the open pits. Development approval documentation is largely submitted, with approvals expected in the first half of 2024