MEK -- 18 December 2023 Shallow Oxide Gold at St Anne’s High...

  1. 2,769 Posts.
    MEK -- 18 December 2023
    Shallow Oxide Gold at St Anne’s
     High grade assay results have been returned from the first 10 infill drill holes at
    St Anne’s (25,000oz @ 2.8g/t Au), part of the Murchison Gold Project. Assays for
    a further 7 holes are expected in January 2024.
     New high-grade gold intersections include:
    o 6m @ 3.71g/t Au from 53m including 2m @ 9.09g/t Au (23SAAC002)
    o 7m @ 3.51g/t Au from 26m including 2m @ 9.84g/t Au (23SAAC004)
    o 15m @ 1.47g/t Au from 34m (23SAAC005)
    o 5m @ 2.15g/t Au from 68m including 2m @ 4.95g/t Au (23SAAC008)
    o 14m @ 2.28g/t Au from 53m incl. 2m @ 4.57g/t Au and 1m @ 13.45g/t Au
    (23SAAC010)
     Results will support a grade control model for the St Anne’s open pits in the
    March 2024 quarter.
     Assays for the final 3 holes from Turnberry are expected in January 2024 and
    work has now commenced on the Turnberry grade control model for the open
    pits.
     Development approval documentation is largely submitted, with approvals
    expected in the first half of 2024
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.